PRODUCTS
PRODUCTS

1100 Litre Bitumen Boiler Cum Sprayer Hire

Our oil/gas fired boilers can be divided into SZS water tube boilers and WNS fire tube boilers depending on the medium inside the tubes. With multiple pressure designs, the water tube boilers can meet the steam supply requirements of 2.5MPa or above. The fire tube boilers, on the contrary, are intended for use at pressures below 2.5 MPa. Fire tube boilers usually have a capacity of below 20t/h, while water tube ones of 20t/h or more as capacity expansion is possible.
Capacity:1-20 t/h
Pressure:0.7-2 Mpa
Chat online
Capacity:20-110 t/h
Pressure:1.25-5.3 Mpa
Chat online
Capacity:2 – 20t/h
Pressure:1.0-2.5 MPA
Chat online
Capacity:4-35 t/h
Pressure:1.0-2.5 MPA
Chat online
Capacity:1400-29000 KW
Pressure:0.8-1.0 MPA
Chat online

Capacity:7000-29000 KW
Pressure:0.8-1.0 MPA
Chat online
20cbm 8x4 modified resin gravel synchronous chi

20cbm 8x4 modified resin gravel synchronous chi

1100 litre bitumen boiler cum sprayer hire. Crack Sealing Machine GD5X-120; Chip Spreader. Chip Spreader DAS-4000 (DAS-6000) 20cbm HOWO 8x4 modified resin gravel synchronous chip seal truck 8x4 20cbm right hand drive bitumen spraying truck ;

ROAD WORK - esay.

ROAD WORK - esay.

16.0 ROAD WORK: Code No. Description: Unit: Rate: 16.1: Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an av

Esay | Engineering In

Esay | Engineering In

The Engineering Info Section provides all sorts of information for Contractors, Consultants, Engineers, Students, Builders and new things in Construction field. This info is very useful for those who are in both Govt and Private sectors. All the information available in the Engineering Info section is provided by a team of civil engineers with more than 30 plus years of field Experience in

CHAPTER G-1 HIRE CHARGE OF PLANTS AN

CHAPTER G-1 HIRE CHARGE OF PLANTS AN

2018-7-5 · 1 Hire charges of Coaltar Boiler 900 to 1400 litres Day 550.00 2 Hire charges of Concrete Mixer 0.14 cubic metre Day 440.00 3 Hire charges of Diesel Road Roller - 8 to 10 tonne Day 1100.00 4 Production cost of concrete by batch mix plant. cum 220.00 5 Hire charges of Diesel Truck - 9 tonne Day 1100

BASIC RATES/ 0.1 HIRE CHARGES OF PLA

BASIC RATES/ 0.1 HIRE CHARGES OF PLA

2018-12-7 · 0001 Hire charges of Coaltar Boiler 900 to 1400 litres day 830.00 0002 Hire charges of Concrete Mixture 0.25 to 0.40 cum with hopper day 800.00 0003 Hire charges of Diesel Road Roller - 8 to 10 tonne day 1315.00 0004 Production cost of concrete by batch mix plant cum 350.00 0005 Hire charges of Diesel Truck - 9 tonne day 1877.00

Esay | Engineering In

Esay | Engineering In

The Engineering Info Section provides all sorts of information for Contractors, Consultants, Engineers, Students, Builders and new things in Construction field. This info is very useful for those who are in both Govt and Private sectors. All the information available in the Engineering Info section is provided by a team of civil engineers with more than 30 plus years of field Experience in

lmt5310txf slurry sealer machinery - michielkraijkamp.

lmt5310txf slurry sealer machinery - michielkraijkamp.

lmt5310txf slurry sealer machinery Micro-Surfacing Equipment LMT5310TXF | Road Construction Micro-surfacing equipment is widely used in construction workmanship in common slurry seal, modified slurry seal and micro-surfaces.

ANALYSIS FOR SCHEDULE OF RATES 2009

ANALYSIS FOR SCHEDULE OF RATES 2009

ANALYSIS FOR SCHEDULE OF RATES 2009 VOLUME - I. V Loading and Unloading 109 to 120 VI 130 to 139 140 to 153 VII

ssr14 - DocShare.ti

ssr14 - DocShare.ti

on basic rate per litre per every metre decrease in staging. 6) For staging above 15 m, the rate shall be increased by Rs.0.10 paise on basic rate per litre per every metre additional staging. 7) The above rates shall be increased / decreased due to increase/decrease in the cost of cement by Basic rate x

109835682 Standard Schedule of Rates 2012 1

109835682 Standard Schedule of Rates 2012 1

cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum Part I – Other Dept.'s Basic Input - Common SoR 2012-13 Sl. No. 1 M-056 AC pipe 100 mm dia Description 2 Unit 3 cum metre litre litre sqm tonne sqm S. Rate for 2012-13 4 782 Rate as per PH item 430 310 347 64,667 870 As per local market rate 74 532 729

109835682 Standard Schedule of Rates 2012 1

109835682 Standard Schedule of Rates 2012 1

cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum Part I – Other Dept.'s Basic Input - Common SoR 2012-13 Sl. No. 1 M-056 AC pipe 100 mm dia Description 2 Unit 3 cum metre litre litre sqm tonne sqm S. Rate for 2012-13 4 782 Rate as per PH item 430 310 347 64,667 870 As per local market rate 74 532 729

SOR 2017 Cov

SOR 2017 Cov

2017-9-7 · L-02 Bitumen Sprayer day ` 340.00 L-03 Blacksmith* day ` 403 00 Description of Labour Unit (A) LABOUR P&M-010 Bitumen boiler oil fired/200 litre Heating of Bitumen litre/ h 400 00 With Viscosity Graded Bitumen of VG-30. cum ` 10,062.60 ii. With Viscosity Graded Bitumen of VG-20. cum `

0.1 HIRE CHARGES OF PLANTS Unit Ra

0.1 HIRE CHARGES OF PLANTS Unit Ra

2018-6-13 · 0.1 HIRE CHARGES OF PLANTS Unit Code No. Description Kochi Taluk Kanayannur, Aluva. Paravur Taluk Kunnathunadu, Muvattupuzha, Kothamangalam Taluk 0001 Hire charges of Coaltar Boiler 900 to 1400 litres Day 1400 1400 1400 0002 Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper Day 2100 2100 2100 0003 Hire charges of Diesel Road Roller - 8 to 10 tonne Day 2900 2900

IndiaMART - Indian Manufacturers Suppliers Exporter

IndiaMART - Indian Manufacturers Suppliers Exporter

IndiaMART.com is India's largest online marketplace that assists manufacturers, suppliers & exporters to trade with each other at a common, reliable & transparent platform. Largest free online business directory & yellow page with listing of 1,945,000 Indian & International companies. Find here quality products, trade leads, manufacturers, suppliers, exporters & international buyers.

scarification of road process - montexvenray.

scarification of road process - montexvenray.

scarification of road process Scarification - Wikipedia. In the process of body scarification, scars are formed by cutting or branding the skin by varying methods (sometimes using further sequential aggravating wound healing methods at timed intervals, like irritation), to purposely influence wound healing to scar more and not scar less.

Vol - Cpwd - MAFIADOC.C

Vol - Cpwd - MAFIADOC.C

Hire charges of Coaltar Sprayer day 250.00 0008 Hire charges of Barber green, drying, mixing and Asphalt Plant, with accessories, capacity 30/45 tonne day 7700.00 Pumping charges of concrete including Hire charges of pump, piping work & accessories etc. cum 200.00 0010 Hire charges of Derrick monkey rope day 800.00 0011

ANALYSS OF RATES-VOLUME-I - SlideSha

ANALYSS OF RATES-VOLUME-I - SlideSha

ANALYSS OF RATES-VOLUME-I, CIVIL ENGINEERING cum 200.000005 Hire charges of Diesel Truck - 9 tonne Day 1,008.000006 Hire charges of Spraying machine including electric charges Day 173.000007 Hire charges of Coaltar Sprayer Day 250.000008 Hire charges of Barber green, drying, mixing and Asphalt Plant, with accessories, capacity 30/45 tonne

Preamble - publichealth.telangana.gov.

Preamble - publichealth.telangana.gov.

2018-8-9 · 1 Asphalt Sprayer / Boiler attendant 260.00 2 Bhisti 260.00 3 Boatman with boat 272.00 4 Carpenter Cl- II / Erector shuttering 260.00 5 Cartman with double bullock cart 305.00 6 Cartman with single bullock cart 282.00 7 Chavali / Navagani 260.00 8 Crowbarman / Jumper man 260.00 9 Fitter Cl- II 260.00 10 Gang man / Head / Survey mazdoor 260.00

Tel:0086-510-68530066

Email:lexie@zozen.com

Addr: No. 76, Xin Da Road, Zhou tie Town, Yixing, Wuxi, China